Sorry for my absence, but I’m back!
HEALTH INSURANCE EDUCATION WORKSHOPS
BIKE MADISON UPDATES
Walking and Biking Survey
A quick reminder that the City of Madison is updating its Pedestrian Plan and finalizing its All Ages and Abilities (AAA) Bike Network and we want to hear from you! Please complete a short survey to tell us about how and where you walk, bike, and roll in Madison and provide input on draft plan goals. The survey takes about 10 minutes to complete, and your responses are anonymous. Your input will inform the planning process and recommendations.
The survey will be available until July 1.
Lake Loop Chip Sealing
It is construction season, and with that comes chip sealing of many local streets. Chip sealing is a cost-effective preventative maintenance method used to extend the useful life of Madison’s streets. However, it can create challenging conditions for people bicycling until the chips are fully embedded or loose chips are swept away.
Waunona Way, part of the Lake Loop south of Lake Monona, was recently chip sealed – please use caution when riding in the area.
It is Getting Hot!
Today is the first day of summer, and we will feel it starting tomorrow! With temperatures expected in the mid-90s over the weekend, make sure you stay hydrated if you are out walking, running, biking, or rolling. This weekend will be a great opportunity to walk or bike to one of our many local ice cream shops. Stay cool out there!
PROJECT UPDATES
Door Creek Watershed Study
Location: 6606 Hopewell Drive
Estimated Schedule: April 6, 2022 – December 31, 2024
June 20, 2025 Update
City Engineering is amending the Door Creek Watershed Study contract so the consultant can complete additional analysis of the undeveloped areas north of I-94 within the watershed to better plan for future development with the City’s Planning Division. This will extend the contract through the summer of 2026.
|
Following the additional modeling and analysis, the City will host a Public Information Meeting to present what conceptual stormwater solutions are needed to meet the City’s flood mitigation targets throughout the watershed. The meeting is anticipated to occur in spring 2026. You can subscribe to updates on the this webpage to be notified when the meeting is scheduled.
Wisconsin Ave Traffic Signal Improvements
June 17, 2025 Update
This page has been created.
The contractor—Parisi—has begun rebuilding the center, concrete islands as of Tuesday, June 10, 2025. Work on the islands will continue for approximately three weeks.
Atticus Way
Location: 4649 Verona Rd
Estimated Schedule: April 1, 2025 – July 3, 2025
June 13, 2025 Update
MG&E has completed the removal and replacement of two poles, and overhead utilities have been relocated. The Contractor will continue with the grading, concrete work (sidewalk and curb & gutter), placement of gravel base, paving and terrace restoration.
High Point Road, South
Location: 7710 Raymond Road
Estimated Schedule: August 1, 2026 – July 1, 2027
June 12, 2025 Update
The preliminary layout of the future S. High Point connection entails a two way left turn lane and a 1-lane roundabout at Raymond Rd. and S. High Point Rd.
Shawnee Pass
Location: 3869 Nakoma Rd
Estimated Schedule: June 16, 2025 – August 29, 2025
June 9, 2025 Update
Due to material availability affecting timelines on this project, the contractor has changed the tentative start date for the Shawnee Pass reconstruction to September 8, 2025. Project completion is expected by early October.
Nakoma Road Sidewalk 2025
Location: 3869 Nakoma Rd
Estimated Schedule: June 16, 2025 – August 29, 2025
June 9, 2025 Update
Due to material availability affecting timelines on this project, the tentative start date for work on the Nakoma Sidewalk has been pushed to Monday June 30, 2025. Completion is expected by early August. The tentative start date for the box culvert portion of the project has been changed to Wednesday July 23, 2025.
Imagination Center at Reindahl Park
Location: 1818 Portage Road
Estimated Schedule: April 28, 2025 – July 31, 2026
June 11, 2025 Update
Construction progress of the Imagination Center at Reindahl Park can now been viewed on the live construction site camera.
Davidson St, Park Ct, Maher Ave, and Gary St Reconstruction
Location: 509 Davidson St
Estimated Schedule: September 22, 2025 – July 3, 2026
June 9, 2025 Update
Transportation Commission Meeting
The Davidson St, Park Ct, Maher Ave and Gary St reconstruction is scheduled for construction in Fall 2026. The project will be presented to the Transportation Commission on June 11, 2025. Meeting information is available on the following link: https://www.cityofmadison.com/
E Wilson Street and E Doty Street Reconstruction
The City’s Contractor is nearing completion of the remaining sections of E Wilson St. Final asphalt paving of the cycle-track and roadway, including pavement markings is scheduled to occur over multiple days starting Wednesday, June 11th going until Saturday, June 14th.
E Wilson St is anticipated to be fully closed from S Pinckney St to S Franklin St for final surface roadway paving, the closure is anticipated to last two days (June 13th and June 14th). For a detailed schedule for the road closure and remaining paving operations (including rain-day backup plans), please review the press release linked below.
https://www.cityofmadison.com/ news/2025-06-06/road-closures- for-wilson-street-final- paving-and-marking-work
PARKS NEWS
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
DANE COUNTY PLANNING DIVISION NEWSLETTER – JUNE
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
METRO UPDATES
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
UPCOMING DETOURS!
Route D2 – Begins Monday, 6/23
A portion of Fitchrona is closed.
Route F – Begins Monday, 6/23
Fourier and Excelsior is closed.
Routes A, B, E, F, R & 75 – Wed. 6/25 from 2:40p until end of service
Buses detour from Main and Pinckney streets.
Next Month
Route 38 – Thursday, 7/3 until 2:30p
Buses detour from Winnequah and Nichols.
DEMOLITION NOTICE
Please be advised that Brian Munson will be filing a demolition permit application on August 4, 2025 for Plan Commission review that calls for a Apartment Buildings located at 305 N Frances St Madison, WI 53703 to be demolished. For more information regarding this forthcoming application, you may contact the applicant, Brian Munson, Vandewalle & Associates, 120 East Lakeside Street Madison, WI 53715 at bmunson@vandewalle.com or (608)609-4410.
Applicant’s Comments:
Core Spaces will be seeking to redevelop the property at 205 North Frances Street for a new mixed use student apartment project.
FINANCIAL LITERACY DROP IN CLASS
Join Us at Sunshine Place for a Free Financial Literacy Drop-In Class
We’re excited to offer a free Financial Literacy class at Sunshine Place!
Dates and Time:
- Tuesday, June 24th | 3:00 PM – 4:00 PM
- Tuesday, July 1st | 3:00 PM – 4:00 PM
These sessions will take place next week and the following week at our 1610 West Main building (the white corner building).
Please note: The class will be offered in English only to start.
If you have any questions, feel free to reach out!
|
BIDS DUE 6/25/25 & 7/3/25
City of Madison Public Works Contracts For Bid:
| Contract | Contract Description | Receive & Open |
|---|---|---|
| 8784 . | E Main Street and South Hancock Street Assessment District – 2025 | WEDNESDAY – 6/25/25 |
| 8785 . | Meyer Avenue Assessment District – 2025 | 7/3/25 |
PLEASE NOTE:
SBE and DBE pre-bid meetings are held virtually. Please see Bid Express for registration details and link.
Bids may be submitted online through Bid Express or in person at 1600 Emil St. The bid results will be posted online after the bid opening.
If you have any questions, please call Alane Boutelle at 608-267-1197 or the Construction Engineer at 608-266-9091.
WATER MAIN FLUSHING
MAP: https://www.cityofmadison.com/
North (Area 13) – East of N Sherman Ave. between Wheeler Rd. and Northport Dr.
East (Area 25) – Between Cottage Grove Rd and Commercial Ave. west of the Interstate
South (Area 30) – South the Beltline and east of Rimrock Rd.
——————————
Questions: Shayne Santi, 261-9128
Flushing Information Line: 261-9178
DETAILS:
Area 13 (North): 4-6 runs per day
Run ID Run Description
13119 Wheeler Rd. from N. Sherman Ave. to Packers Ave.
13121 Packers Ave. (Gulseth St – Govt. Rd)
13122 Rigney Ln. from N. Sherman Ave. to 4301 Ringley Ln.
13123 Anhalt Dr. from Ringley Ln. to Prairieview Dr. to 4301 Prairieview Dr.
13124 Anhalt Dr. & Prairieview Dr. – Doe Crossing Trl. & Pond. St.
13125 Pond St. (Prairieview Dr – Whitetail Ln)
13126 Gulseth St. (Packers Ave – 4609 Hollow Ridge Rd.)
13127 Hollow Ridge Rd. from Gulseth St. to Pond St.
13128 Anhalt Dr. (Doe Crossing Trl. – 4301 Whitetail Ln.)
13129 From Anhalt Dr. & Whitetail Ln. to Buhler Ct. cul-de-sac.
13130 Anhalt Dr. & Buhler Ct. – Packers Ave. – btwn Anhalt Dr. & Govt Rd.
13131 Packers Ave. – Tennyson Ln.
13132 N Sherman Ave (Troy to Northport), Northport (Sherman to Dryden)
13133 Packers Ave. from Tennyson Ln. to Londonderry Dr.
13134 Tennyson Ln. from N. Sherman Ave. to Kipling Dr.
13135 Spenser Ln. from Tennyson Ln. to Thackeray Rd.
13136 Eliot Ln. from Tennyson Ln. to Thackeray Rd.
13136.2 Eliot Ln north of Tennyson
13136.3 Whitman Ln
13137 Thackeray Rd. from N. Sherman Ave. to Kipling Dr.
13138 Kipling Dr. (Tennyson & Packers – Browning Rd)
13139 Browning Rd. from N. Sherman Ave. to Kipling Dr.
13140 Shelley Ln. (Kipling Dr. – Dryden Dr. – Browning Rd.)
13141 Scott Ln. from Kipling Dr. to Dryden Dr.
13142 Browning Rd. & Kipling Dr. – Packers Ave. – Northport Dr.
13601 Wheeler Rd Across Packers, Express Cir and Dovetail Dr
13602 8″ Main Parallel to Packers from Wheeler to Dovetail
13603 8″ Main Running East from Packers-Wheeler Intersection
13604 8″ Main from East end of Dovetail running North to “CV”
13605 6″ Main from Wheeler Rd to Dennis Dr
13606 Larry Ln and Dennis Dr
13607 Dennis Dr, Fieldstone Ln, and “CV”
Area 25 (East): 5-7 runs per day
Run ID Run Description
25001 Whitehall Dr/Thompson Dr (Queensbridge to Portsmouth)
25002 Queensbridge – Harmony Hill – Spicebush (Whitehall to midway Spicebush)
25003 Queensbridge – Kingsbridge – Merryturn – Kevins (H. Hill to Valley)
25004 Queensbridge – Merryturn – Kevins (Kingsbridge to Valley)
25005 Knightsbridge – Merryturn – Kevins (H. Hill to Valley)
25006 Kevins Way (entire length)
25007 Greenbriar – Merryturn – Kevins (H. Hill to Valley)
25008 Spicebush – Merryturn from Whitehall
25009 Vicar – Merryturn (Whitehall to Retana)
25010 Merryturn Rd from Greenbriar to Retana
25011 Retana Dr – Meadowlark Dr (Merryturn to Onyx)
25011.1 Cobblestone Ct
25011.2 Hitching Post Ct
25012 Merryturn Rd – Cavendish Ct
25012.1 Severn Wy – St. Albans Av (Cavendish to N end )
25013 Portsmouth Wy (St. Albans to Merryturn)
25014 Westminster Ct
25015 Windsor Ct
25016 St. Albans Av (Portsmouth to Severn)
25016.1 Thompson Dr (Severn to S end)
25016.2 Joshua Cir (SW half of loop)
25016.3 Joshua Cir (NE half of loop)
25017 Brookshire Ln
25018 Coach House Dr – Stage House Trl (Retana to Lamplighter)
25018.1 Hackney Wy – Lamplighter Wy (Coach House to Milwaukee)
25019 Sudbury Wy – West of Coach House Dr
25019.1 Sudbury Wy – Lamplighter Wy up to Milwaukee St
25019.11 Milwaukee St -Swanton Rd from N Thompson to Easley Ln
25019.2 Swanton Rd – N Thompson Dr from Easley Ln
25019.21 Milwaukee St – Kurt Dr (Lamplighter to Thompson)
25019.3 Thompson Dr – Kurt Dr – to 5034 Piccadilly Dr
25019.4 Trafalger Pl (Kurt Dr – East dead end)
25019.5 Piccadilly Dr – Andrew Wy form Kurt to Milwaukee
25019.6 Trafalger Pl (Kurt to Daffodil) then down Daffodil to Milwaukee St
25019.7 Violet Ln – Daffodil Ln to Milwaukee St
25019.8 Gem Ct
25019.81 Opal Ct
25019.82 Ruby Ct
Area 30 (South): 4-6 runs per day
Run ID Run Description
30020 Badger Lane from Moorland Road through Rockwood Drive to Seven Nations Dr.
30022.1 Rimrock Rd – Moorland to E Badger
30022.2 Rimrock Rd – Maloney Dr (Moorland to W end Maloney)
30022.3 Latitude 43 St
30022.4 Novation Pkwy north of Latitude 43 St
30022.5 Novation Pkwy from Latitude 43 to Ski Ln
30024 Fell Road, Ocean Road, Mission Circle
30025 Golden Gate Way, Ocean Road, Mission Circle (again)
30026 Ocean Road east end
30027 Ocean Road west end
30028 Badger Ln – Nob Hill Rd (Moorland to 1st hydrant E of Badger)
30029 Dunwoody Drive north from Moorland Road the west on Badger to Rimrock
30030 E Badger Road (Badger Ln to W end)
30032 Burdette Court west from Rimrock Road to dead end hydrant
30033 Munn Road east from Badger Lanet to dead-end hydrant
30034 Holtzman Road east from Badger Lane to dead-end hydrant
30035 Coyer Lane east from Badger Lane to dead-end hydrant
30036.1 Moorland Dead end
30036.2 Raywood Rd-royal AV easement(East of H003 page 5662)
30036.3 Royal Avenue southwest from hydrant 3 toward Industrial Drive
30037 Nob Hill Road from Royal Avenue west past Nob Hill and Whalen Transfer to the large parking lot on on the south side
30038 up Nob Hill to dead-end hydrant
30039 Industrial Drive east from Royal Avenue to dead-end fire hydrant
30041 Nob Hill Rd (Badger Ln to Badger Rd)
30042 From Nob Hill Road, across the Beltline, then west to Rimrock, then N along Rimrock to Rusk
30043 from Nob Hill Rd, across the Beltline, then to the right along the Beltline on-ramp then right toward John Nolen Drive